Anoalite Hospital: Optimized Solar Energy for a Lasting Impact
Update on the photovoltaic project at Anoalite Hospital in Mungbere, Haut-Uele, by GoShop Energy. The article describes the installation of a three-phase system with a capacity of 63 kWp, 45 kVA, and 60 kWh in May 2025, designed to provide reliable green energy. This update includes configuration improvements, regular maintenance, on-site staff training, and the setup of a VRM account for remote monitoring. This represents a significant step toward energy self-sufficiency for the healthcare facility.
50%
CO2 reduction
50%
energy saving
6.000
tons produced every year
In May 2025, we installed a three-phase system with a capacity of 63 kWp, 45 kVA, and 60 kWh at Anoalite Hospital in Mungbere, located 235 km from Durba and 135 km from the city of Isiro in the Watsa territory of Haut-Uele province. In doing so, we resolved a previously existing issue of limited access to clean and reliable energy. The system has been operational ever since.
To ensure the long-term sustainability of solar energy at this healthcare facility, we are continuing our work on the project. It is essential to adapt to local conditions while continuing to train local teams in site management.
As a reminder, the project was launched on May 4, 2025. It includes a capacity of 63 kWp, three 45 kVA inverters, and a storage capacity of 60 kWh, which provide the necessary energy for the entire hospital. For additional information, please click here.
Our upgrade included:
A system configuration optimized to precisely meet their requirements, thereby ensuring the continuity of essential services throughout the facility;
We provide ongoing maintenance and monitoring to ensure the equipment operates optimally at the hospital, including 24-hour operational lighting. Two 2000 Wp electric pumps are in operation between 9 a.m. and 11 a.m., 2 p.m. and 4 p.m., and 6 p.m. and 8 p.m.;
Five individuals, including the client himself, his maintenance technician, and three members of his team from Italy, received training on the operation, monitoring, and maintenance of the system,
the setup of a VRM account for the client and his team, enabling effective remote management;
Thorough review of all system configurations;
Final photos taken to commemorate the completion of this crucial phase of the project;
This milestone marks significant progress toward energy independence for Anoalite Hospital. Thanks to all these improvements and the active involvement of the staff, the facility is now managed with unparalleled expertise and confidence.
GoShop Energy is dedicated to providing tailored support to each client, paying attention to every detail.
Please feel free to contact us for more information
GoShop Energy, Your Energy Provider